Complete House Construction

Your house,from land to keys.

One engineering team for every civil-works stage of your house in Bangladesh: land checks, survey, soil test, design and approval, construction with supervision, materials and handover.

  • Engineers at every stage
  • BNBC 2020 design
  • One team, one contract

What the package covers.

Eight stages, in the order a house is built. Take the whole package, or book only the stages you need.

  1. 01

    Land and site selection

    We do

    We help you find the right land or property, with title, zoning and plan checks before you pay.

    What to check

    • Ask a lawyer to check the title: the deed (dalil) and the earlier deeds before it, the record of rights (khatian) of the latest survey, mutation (namjari) in the seller's name, and land development tax paid up to date.
    • Ask the lawyer to confirm at the sub-registry office that no loan, case or other sale is recorded against the land.
    • Find out what the area plan allows on this plot (in Dhaka, the DAP and the building rules) before you agree a price.
  2. 02

    Survey

    We do

    A digital topographic survey of the plot and its surroundings: boundaries, levels and the road in front.

    Tools for this stage

    What to check

    • Measure the plot on site and compare it with the area in the documents. Note the width of the road in front.
  3. 03

    Soil investigation

    We do

    Boreholes, SPT and laboratory tests, and a report that tells the designer what the ground can carry.

    What to check

    • Test the soil before the structural design starts; the structural engineer decides how many boreholes and how deep.
    • The report should give the soil layers, SPT N values at each depth, the groundwater level and the recommendations. Keep it with your building papers.
  4. 04

    Architectural design and approval

    We do

    Layouts that fit how you live, and the approval drawings, followed through the approving authority.

    Tools for this stage

    What to check

    • Find out which authority approves plans for your plot: a development authority (RAJUK, CDA, KDA, RDA and others), a city corporation or pourashava, and outside those areas the BC Committees formed in 2026 under the Bangladesh Building Regulatory Authority Act, 2026.
    • Do not start construction until the approval is in hand.
  5. 05

    Structural design

    We do

    Analysis, design and drawings to BNBC 2020: foundation, frame, earthquake and wind.

    What to check

    • Ask for the design calculations and the structural drawings, signed by the structural engineer, and keep them with the approval papers.
  6. 06

    Construction and supervision

    We do

    Construction with an engineer on site at every key stage, quality control and progress tracking.

    What to check

    • Have the engineer inspect before every concrete pour: formwork, rod sizes, spacing and cover against the drawings.
    • Keep the test results of concrete cubes and rods, and cure concrete as the specification says.
    • Check brickwork, plaster and waterproofing (roof, bathrooms) before they are covered.
  7. 07

    Materials supply

    We do

    Cement, rebar, aggregate and concrete sourced and tested, so what goes into the building is what was specified.

    What to check

    • Compare the quantities in the bills with the drawings, and keep the delivery notes and test reports.
  8. 08

    Handover

    We do

    A final inspection, defect repair and the handover documents, then the keys.

    Tools for this stage

    What to check

    • Walk through every room before the final payment, and list the defects in writing.
    • Collect the as-built drawings, test reports, warranties and the approval documents, and apply for the occupancy certificate where the authority requires it.

Drawings of the kind every house needs: the plot, the soil under it, the structure and the rooms.

  • RoadN
    Site plan and survey points
  • FillingSoft claySilty sandDense sandN = 4N = 6N = 9N = 14N = 22N = 310 m10 m20 m30 m
    Soil profile from a borehole
  • Wind and earthquakeH
    Frame and pile foundation
  • BedroomBathBedroomKitchenLivingDining
    Floor plan

Drawings for illustration.

Choose how you build.

The full package

Every stage with one team, from the land to the keys, under one written scope and price.

Book the full package

Single services

Only the soil test, only the design, only the supervision: book the stages you need.

See all services

How it starts

  1. 01

    Tell us about the plot

    Where it is, its size, and what you want to build, by WhatsApp, phone or the form.

  2. 02

    Site visit and quote

    We visit the plot, check the papers you have, and send a written scope and price.

  3. 03

    Work begins

    Each stage starts when you are ready, with reports you can keep.