Estimation & BOQ
Concrete Estimator
Cement bags, sand and stone or brick chips for a concrete mix such as 1:2:4 or 1:1.5:3, from the size or the volume.
Concrete, steel bar by bar and formwork for a slab, beam, column, footing or stair, from the sizes on the drawing, with a bar schedule for Excel.
The tool gives a first answer. For a design solution for your own building or site, send your result and a few details to a Civilyst engineer.
Need more from this tool? Send the inputs you used and what you need. A Civilyst engineer reads every message.
Send feedbackFrom the member's sizes and bars on the drawing: concrete from its volume, steel bar by bar from each bar's length and weight, and formwork from the faces in contact with the concrete. Enter a slab, beam, column, footing or stair and the tool gives all three, with a bar schedule for Excel.
Last updated · Maintained by Md. Mohaimanul Islam (Rifat), civil engineer
Type the sizes and bars from the drawing: the tool counts every bar from its spacing, cuts it to length inside the cover with its bends, hooks and laps, and gives the concrete with its cement, sand and chips, the steel by diameter, and the formwork. For footings it adds the PCC, the excavation and the filling; for stairs it finds the risers. A drawing marks each size with the letter of its box.
| Symbol | Unit | Quantity | System |
|---|---|---|---|
| ft | foot | length | Imperial |
| m | metre | length | SI |
Estimation & BOQ
Cement bags, sand and stone or brick chips for a concrete mix such as 1:2:4 or 1:1.5:3, from the size or the volume.
Estimation & BOQ
Rod weight by diameter and length, a bar bending schedule with totals by diameter, and a cutting plan from 40 ft or 12 m bars with the least waste.
Estimation & BOQ
Bricks, cement bags and sand for a 5 in or 10 in brick wall, with openings deducted and every factor shown.