Estimation & BOQ
Brickwork Estimator
Bricks, cement bags and sand for a 5 in or 10 in brick wall, with openings deducted and every factor shown.
Cement bags and sand for wall plaster, by area, thickness and mix, on one side or both.
The tool gives a first answer. For a design solution for your own building or site, send your result and a few details to a Civilyst engineer.
Need more from this tool? Send the inputs you used and what you need. A Civilyst engineer reads every message.
Send feedbackCement and sand come from the plastered area times its thickness, turned into a dry volume (1.27 by default) and split in the ratio of the mix. Enter the area, the thickness and the mix, on one side of the wall or both, to get cement bags and sand.
Last updated · Maintained by Md. Mohaimanul Islam (Rifat), civil engineer
Enter the wall size (feet or metres), whether one or both sides are plastered, openings to deduct, the thickness and the mix. The estimator gives cement in 50 kg bags and sand in cft and m³, with every factor shown and editable.
| Symbol | Unit | Quantity | System |
|---|---|---|---|
| ft | foot | length | Imperial |
| m | metre | length | SI |
| mm | millimetre | length | SI |
| sft | square foot | area | Imperial |
| cft | cubic foot | volume | Imperial |
| m³ | cubic metre | volume | SI |
| bag | cement bag | count | Local (BD) |
Estimation & BOQ
Bricks, cement bags and sand for a 5 in or 10 in brick wall, with openings deducted and every factor shown.
Estimation & BOQ
Cement bags, sand and stone or brick chips for a concrete mix such as 1:2:4 or 1:1.5:3, from the size or the volume.
Estimation & BOQ
Rod weight by diameter and length, a bar bending schedule with totals by diameter, and a cutting plan from 40 ft or 12 m bars with the least waste.