Estimation & BOQ
RCC Element Quantities
Concrete, steel bar by bar and formwork for a slab, beam, column, footing or stair, from the sizes on the drawing, with a bar schedule for Excel.
Stage-by-stage quality checks for building work, from setting out to painting, answered Yes, No or N/A, with a PDF report to sign.
The tool gives a first answer. For a design solution for your own building or site, send your result and a few details to a Civilyst engineer.
Need more from this tool? Send the inputs you used and what you need. A Civilyst engineer reads every message.
Send feedbackEach stage has its own checks, from setting out and reinforcement before casting to brickwork, plaster and painting. Answer each item Yes, No or N/A as you check the work and download a PDF report with places to sign; printed blank, it is a site form.
Last updated · Maintained by Md. Mohaimanul Islam (Rifat), civil engineer
Ten checklists for the stages of building work, from setting out to painting, each with the checks a site engineer makes before the work goes on: about a dozen items a stage, with how to check them and the usual figures. Answer each item Yes, No or N/A, add notes, and download a PDF report with the project details, the result and places to sign. Printed blank, the same report is a form to fill in by hand.
Estimation & BOQ
Concrete, steel bar by bar and formwork for a slab, beam, column, footing or stair, from the sizes on the drawing, with a bar schedule for Excel.
Estimation & BOQ
Cement bags, sand and stone or brick chips for a concrete mix such as 1:2:4 or 1:1.5:3, from the size or the volume.
Real Estate
A room-by-room flat handover checklist that turns what you find into a PDF defect report for the developer.