Skip to content

Job search kitfrom CV to first day.

Where the jobs are, a CV that gets read, the tests and the interview, the questions each field asks, and how to start well.

Checked 12 November 2026. General practice gathered from public advice, not rules: employers differ, and the advertisement always comes first. Something to add or update? Tell us.

01

Where the jobs are

  • Company websites and LinkedIn pages: contractors, consultants and developers post there first.
  • Job portals, for the wide view.
  • People: teachers, seniors, classmates and the engineers you met on an internship. Many site and design jobs are filled by a recommendation before they are advertised.
  • Government posts: only through the official circular.
  • Projects: when a firm wins a large project, it hires. Follow the news of your field.

02

A CV for a civil engineer

One page for a fresh graduate, two at most with experience. The reader gives it half a minute.

  1. Name and contact

    Name, phone, email and city, and a LinkedIn address if you keep it current.

  2. Two lines about you

    What you are, what you can do and what you are looking for. Written for this job, not for every job.

  3. Education

    Degree or diploma, institution, year and result. Your thesis or final project in one line.

  4. Projects and experience

    Each as what you did and what came of it: "Prepared the bar bending schedule of a six-storey building and checked it on site against the drawings." Numbers where you have them.

  5. Skills

    Software with your honest level, survey instruments, the codes you have used, languages.

  6. Training and memberships

    Short courses, and membership of the IEB or IDEB.

  7. References

    Two people who know your work and have agreed to be asked.

  • Do not send the same CV to every employer.
  • Do not list software you opened once.
  • Leave out personal details the employer did not ask for.
  • Ask someone to read it for spelling.
  • Send a PDF with your name in the file name.
Civilyst's CV Builder sets these parts out for you in four designs and gives you the CV as a PDF or a Word file. It is free and needs no account.
  • CV Builder

    Civilyst

    Write the CV, choose a design, download it.

03

Applying

  • Read the advertisement twice, and answer what it asks for, in its order.
  • Write a short email: the post, who you are in two lines, and the CV attached.
  • Follow up once, after a week.
  • Keep a list of where you applied, when, and what you sent.

04

Written tests

Many employers, public and private, begin with a written test: basic engineering, simple calculations, English, and sometimes a drawing to read.

  • Most questions are fundamentals asked quickly. Go back to your second and third year notes.
  • Be at ease with units and with rough estimates in your head.
  • Practise against the clock.
  • Read the question to the end before you start.

05

The interview

  • Know your own CV: every line can become a question.
  • Know the employer: their projects and their kind of work.
  • When you do not know, say so, and say how you would find out.
  • Expect something practical: read this drawing, estimate this wall, what would you check before this pour.
  • Ask one good question about the work.
  • Be on time and plainly dressed, with printed copies of your CV and certificates.

06

Questions to be ready for

By field. They come without answers on purpose: work each one out, and be ready for the question that follows it.

  • Structural design

    • What loads act on a building, and how are they combined under BNBC 2020?
    • How do you find the seismic zone coefficient and the site class of a site?
    • Why is ductile detailing needed, and where are the ties placed closer together?
    • How do you choose between isolated footings, a mat and piles?
    • How do you check a computer model before you trust its results?
  • Geotechnical and foundations

    • How is the standard penetration test done, and which corrections are applied to N?
    • How do you estimate the capacity of a pile from a borehole log?
    • What is liquefaction, and how do you judge whether a site may liquefy?
    • What does a consolidation test tell you?
    • What would make you doubt a soil report?
  • Construction and site

    • What do you check before a slab is cast?
    • What is the cover to reinforcement for, and what happens if it is wrong?
    • How do you cure concrete, and for how long?
    • How do you read a bar bending schedule?
    • What would you do if you saw unsafe work at height?
  • Quantities and contracts

    • How do you work out the bricks, cement and sand in a wall?
    • What is the difference between the wet and the dry volume of concrete?
    • How do you prepare the rate analysis of an item?
    • What is a variation, and how is it valued?
    • How do you check a contractor's bill?
  • Roads and transport

    • What are the layers of a flexible pavement, and what does each do?
    • What is the CBR test, and how is its result used?
    • What is superelevation, and why is it needed?
    • How do you carry out a traffic count?
    • What makes a junction unsafe?
  • Water resources

    • What is Manning's equation used for?
    • How do you estimate a design flood?
    • How can an embankment fail?
    • What data does a river model need?
    • How does a regulator differ from a sluice?
  • Water supply and environment

    • What are the steps of a water treatment plant?
    • What do BOD and COD measure?
    • How do you design a pipe network so that the pressure is enough everywhere?
    • What does an environmental impact assessment contain?
    • How would you find out why a tubewell's water is unsafe?
  • Surveying and GIS

    • How do you set out a building?
    • What are the sources of error in levelling?
    • How does a total station differ from satellite (GNSS) surveying?
    • How do you make a contour map from surveyed points?
    • How do katha, decimal and bigha relate, and why does it depend on the place?
  • Project management

    • What is the critical path?
    • How do you measure the progress of a project?
    • What goes into a daily site report?
    • What would you do if a project is two weeks behind?
    • What is a variation order?
  • Real estate development

    • What is the floor area ratio, and how does it limit a building?
    • What are setbacks?
    • What do you check when a flat is handed over?
    • Which approvals does a building need before work starts?
    • How do you control the quality of finishing works?
  • Teaching and research

    • Explain your thesis to someone outside your field.
    • Teach this topic in five minutes.
    • What would you research next, and why?
    • How do you choose a journal?
    • How would you help a student who is falling behind?
  • Government service

    • Why this organisation?
    • What does this department do, and what are its main projects?
    • How are public works tendered?
    • What is a schedule of rates?
    • What would you do if a contractor's work is below the specification?

07

The first 90 days

  • Learn names: the foreman, the storekeeper, the surveyor, the consultant's inspector.
  • Keep a notebook: what you were asked to do, what you did, and what you did not understand.
  • Read the drawings of your project until you can find any detail in a minute.
  • Ask early. A question on day ten is cheap; a mistake on day sixty is not.
  • Wear your safety gear, always.
  • Never sign or approve what you have not checked.

(Contact an expert)

For advice on your own CV, an interview you have coming, or your next step, ask a Civilyst engineer.